● root@hvsc:~/so-hoa# ./khao-sat --hien-trang --lo-trinh

Business digitalizationAssess the current state, build a step-by-step roadmap, implement and train your team

Customers in a notebook, orders in a Zalo group, reports compiled by hand from many Excel files. Digitalization doesn't start with buying software. HVSC engineers sit with you and the people doing the work, redraw the workflow, pick a few worthwhile tasks to do first, implement them, then guide the team until they can use it on their own.

  • Done in phases, quoted phase by phase
  • Prefer existing and open-source tools
  • Back up old data before migrating
  • Hotline 0939.502.093
ban-do-hien-trang.svgillustration
Các công cụ rời rạc như sổ tay, Excel, Zalo, email được nối về một nguồn dữ liệu chung sổ tay file Excel nhóm Zalo email dữ liệu chungkhách · đơn · việc → báo cáo tự cập nhật→ phân quyền theo vai trò→ sao lưu ngoài máy
// An illustration of the idea. Each business has its own map after the survey session.

01Self-assess your digitalization level

Where is each area of work now?

Choose one box per row. The result shows only on your own device and is not sent anywhere. This is a suggestion on where to start, not a substitute for the survey session.

Customers, sales
Orders, inventory
Internal tasks, approvals
Documents, contracts, storage
Reports, management figures

$suggestion

Choose a level for each area to see a suggestion on where to start.

Send a survey request

02A four-step roadmap

One step at a time, each step with something to hold

We don't change the whole company at once. Each step ends with a concrete result for you to approve before moving on.

  1. 01

    Current-state survey

    Talk with the business owner and the people doing the work; look at the tools, Excel files and paperwork in use; redraw the real workflow.

    You receive: a description of the current state and a list of bottlenecks.

  2. 02

    Build the roadmap

    Order work by impact and difficulty; choose tools: use what exists, open-source software, or custom-built; divide into phases.

    You receive: a phased roadmap with a quote for each phase.

  3. 03

    Implementation

    Install, configure and migrate old data after backing it up; run in parallel with the old way for a while; adjust based on user feedback.

    You receive: a system running on real work and configuration documents.

  4. 04

    Training

    Role-based training: business owner, managers, staff. Step-by-step documents so newcomers can still learn on their own.

    You receive: a team that can use it, with documents to refer back to.

kysu@hvsc:~/nang-luc$ cat so-hoa.md

The digitalization team working for you runs on the system we built

// the team in charge

Business digitalization is done by engineers in HVSC's technology area. HVSC itself runs its ticketing area on a system the team built: requests come in through a form, each case has a code, permissions by role, and a log of every step. That approach is reused when surveying, building roadmaps and implementing for other businesses.

since
09/09/2016
khach
VN · USA · Australia

// proof

  • HVSC booking systemForms, coded cases, permissions, logs: used every day by the ticketing area.Xem
  • Open-source software firstHVSC's infrastructure runs Linux, nginx and MariaDB; consulting includes license checks.Xem
  • Backup before migratingOld data is backed up and run in parallel until the team is used to the new way.

04Working principles

Do's and don'ts of digitalization

do

  • Start with the most repetitive, most labor-intensive task.
  • Reorganize the process first, then move it onto software.
  • Back up old data before migrating, and cross-check after migrating.
  • Run in parallel with the old way of working for a while.
  • Use existing or open-source tools before writing custom software.

don't

  • Buy many software packages at once and let each department fend for itself.
  • Put a still-vague process onto software, and errors will simply run faster.
  • Force the whole company to change how it works in a single day.
  • Leave company data scattered across employees' personal accounts.
  • Skip training because the software seems "easy to use".

05Learn before you act

Business owners who want to understand it first?

HVSC Edu offers a course on business digitalization and AI for business owners: learn step by step through survey, planning, implementation and team training. After the course, the survey session with our engineer will be faster and more on target.

06FAQ

Ask about business digitalization

Where should business digitalization start?

With a survey of the current state: how work actually runs, who does it, which tools are used, and where data has to be re-entered many times. Then pick one or two of the most repetitive tasks to do first, rather than changing the whole company at once.

Do small businesses need to go digital?

You don't need to do everything. Many small businesses start with one thing, such as customer management, orders or a shared document store, then expand once they see results.

Do we have to buy new software?

No. HVSC prioritizes using existing tools or legitimate open-source software. Custom software is built only when your process is truly specific.

Can old data in Excel and paper records be migrated?

Usually yes. HVSC backs up the old data first, cleans it, migrates a portion as a trial and checks it with you before migrating everything.

What about older staff who are wary of technology?

Training is role-based, step by step, with documents to refer back to. The new system runs in parallel with the old way for a while so everyone can get used to it gradually.

How is the cost of digitalization calculated?

It depends on the scope of each phase. After the survey session, HVSC sends a roadmap with a quotation for each phase so you can decide how far to go.

Does digitalization include AI?

It can, once your data is consolidated in one place. The AI part for business owners is covered on a separate page: choosing tasks worth giving to AI and rules for using it safely with company data.

$ hvsc --lien-he

Tell HVSC how your work currently runs

Briefly describe how your company manages customers, orders and paperwork, or attach the Excel file you use. An HVSC engineer will contact you to schedule a current-state survey and discuss scope and quotation.

The HVSC website is being continuously upgraded — some content may be updated further.